Based on the equipment used and the WiFi design being implemented, the site hardware must be configured correctly before installation. This ensures that engineers can test and verify the network once installed.
The next step in the installation phase is the installation of all the network equipment, including APs, switches, cables, and various other pieces of network hardware. All of the hardware is installed using the design plans from the site survey to provide the best WiFi coverage throughout an area.
The cutover process is specific to a project with an upgrade. It is the last step in the install phase as it is the transition from the existing network to the newly redesigned network. During the cutover, there will be brief interruptions in connectivity due to the disconnection of the previous network.
[email protected] - General
[email protected] - Sales
[email protected] - Support
703.870.3949 extension 100 - Sales
703.870.3949 extension 101 - Support
Mon-Fri 8:30 am - 5:00 pm (EST)
Our blog covers a wide range of tech topics, concentrated in the WiFi field. We enjoy writing about the latest trends and technologies being developed for enterprise WiFi deployment, as well as discussing the How To's / Basics of providing WiFi to businesses.
These topics fall into a few categories:
[fa icon="phone"] +1 (703) 870-3949
[fa icon="fax"] +1 (703) 870-3779
[fa icon="envelope"] [email protected]
[fa icon="envelope"] [email protected]
© 2022 AccessAgility, LLC | 8609 Westwood Center Drive, Suite 750 Vienna, VA 22182